Ladies Dayton Fleece Hoodie - Savage
SKU
SS00020196
As low as
$44.58
In stock
Only %1 left
Production lead time
14 Business Days
Imprint Method
Embroidery
Product Description
Made from a comfy cotton-poly blend, the Dayton has a trendy crossover-front neckline, rib knit cuffs with thumb exits, an interior phone pocket and headphone cord port.
Production time is 5-7 business days. Production time can be longer if a proof is required or if large quantities are ordered. Production time does not include shipping time.
Production time is 5-7 business days. Production time can be longer if a proof is required or if large quantities are ordered. Production time does not include shipping time.